Our website uses cookies to improve and personalize your experience and to display advertisements(if any). Our website may also include cookies from third parties like Google Adsense, Google Analytics, Youtube. By using the website, you consent to the use of cookies. We’ve updated our Privacy Policy. Please click on the button to check our Privacy Policy.

  • English
  • Français

Case Studies

Case Studies
Construction drafts

General planning is an essential part of the management and execution of construction projects. It requires a rigorous technology choice, excellent work tasks definitions, precise estimation of resources and the durations for individual tasks and any interactions among them.

We include the HERS (Home Energy Rating System) scores in our energy appraisals to consider energy-efficiency in the design of new homes and remodels.
Our architectural feasibility study considers all of the aspects of the proposed project and tests its viability before undertaking any real significant expense.
The final life-cycle cost is calculated as follow: Life-cycle costing (LCC) = capital cost + lifetime operations cost + lifetime maintenance costs + disposal costs - residual value.

Yenex Consulting develops, produces, and reviews standard construction documents, forms and contracts.

COMMITTED TO OUR CLIENTS VISION

EXTENSIVE EXPERIENCE

Our engineering team has designed, planned, built and managed infrastructures such as roads, tunnels, bridges, airports, railroads, facilities, buildings, dams, utilities and other projects.

EASY AND AFFORDABLE

Our cost engineers determine the optimum balance between cost, quality and time requirements to budget, plan, and monitor all projects.

INNOVATION AND RESEARCH

Research and innovation are vital to provide new methods and technologies to slash the energy consumption and CO2 emissions. Our research focuses on nanotechnologies, advanced materials and manufacturing, and biotechnologies.

WE ARE A TEAM OF HIGHLY-SKILLED PROFESSIONALS

Our value engineering aims to analyze designed building features, systems, equipment, and material selections in order to achieve essential functions at the lowest life cycle cost with high performance, quality, reliability, and safety.

The objective of our construction management plan is to minimize the impacts of construction activities on residents, roads, and parking in the vicinity of the site.